Pillar guide: Planning and building rules

Agricultural land to building land in Italy: who decides

Planning and building rules·13 min read·Updated 13 November 2026·By TerrenoCheck editorial team (Kandyb Studio)
On this page

Agricultural land in Italy becomes building land only by decision of the Comune (the municipality) under the regional planning law: the owner can propose and object, not decide. In Emilia-Romagna, outside the urbanised area, the main route is an accordo operativo (development agreement) voted by the municipal council after a 60-day public deposit for objections. Municipal property tax (IMU) on building land can be due as soon as the general plan is adopted; the special levy and building charges come with the building work, each with its own conditions.

In short

  • A building permit is issued only in line with the planning documents (DPR 380/2001, art. 12): the Comune changes the zoning through the regional procedure, not the owner or the seller.
  • In Emilia-Romagna the general plan (PUG) gives no building rights to open land, apart from direct urban reuse and regeneration works; outside the urbanised area new development goes mainly through an accordo operativo: 60 days of public deposit for objections, an opinion from the Comitato urbanistico (planning committee) unless exempt, then a council vote.
  • In Emilia-Romagna new land for housing may be taken only to start regenerating mainly residential urban areas or for social housing, with the rules for rural land left in place; the total stays within 3% of the urbanised area as at 1 January 2018, leaving out the areas the law does not count.
  • For IMU (municipal property tax) land counts as building land once the planning documents allow building on it, and for the general plan adoption is enough. Land owned and farmed by a coltivatore diretto or IAP (registered farmer) enrolled in farmers' social security, who keeps farming it, does not count; the Comune confirms the status on request.
  • For projects that depart from the plan (in variante or in deroga) the Comune works out the increase in value and takes at least half as a contributo straordinario (special levy), unless regional rules or the municipal plan say otherwise; in Emilia-Romagna it applies outside the urbanised area and on unserviced permeable land inside it.

60 days

Public deposit of a development agreement

Emilia-Romagna: anyone can file objections within this period.

Emilia-Romagna Regional Law 24/2017, art. 38

50%

Minimum share of the added value to the Comune

Projects in variante or in deroga; unless regional rules or the municipal plan say otherwise.

DPR 380/2001, art. 16

7.19%

Share of Italy built over in 2025

Land covered by artificial surfaces, ISPRA estimate.

SNPA, Land consumption report 2026, table 18

The report brings together public information about the land, with sources and dates, to prepare questions for the relevant offices: €29 in English or Italian · €39 in both languages · total, VAT included.

What this page does not replace. It is a guide for buyers and owners of land, not legal or tax advice. The Comune certifies the zoning in the CDU (zoning certificate); its offices work out IMU and building charges. The procedure described is Emilia-Romagna’s; the amounts in the examples are hypothetical.

Who decides: the Comune through its plan, not the owner

Under DPR 380/2001, art. 12, para. 1, a building permit is issued only in line with the planning documents. On land zoned agricultural you can build only what the plan allows in farming zones (see building a house on agricultural land).

The plan is drawn up by the Comune (1942 planning law, art. 8); its name and the procedure for changing it depend on regional law, and in Emilia-Romagna the general plan is the PUG (piano urbanistico generale) under Regional Law 24/2017. Owners take part through objections and, where the regional law allows, proposals; the Comune decides. A seller’s promise is not a decision: for building, what counts is the act that has taken effect under the regional law.

Emilia-Romagna: when new land may be built on

This section and the next apply only to Emilia-Romagna (Regional Law 24/2017, current text). Elsewhere, ask the Comune’s planning office (ufficio urbanistica).

The PUG draws the boundary of the urbanised area (territorio urbanizzato). Rural land stays outside, even when enclosed between urbanised areas (art. 32, para. 3). Apart from direct urban reuse and regeneration works under art. 26, the PUG never gives open land a right to build, building potential or any legally protected expectation (art. 25, para. 1).

Here land take (consumo di suolo) is a balance: land that detailed plans earmark for development outside the urbanised area, minus land inside it earmarked for unsealing (art. 5, para. 5). Two limits apply:

  • For what. It is allowed only for public works or works of public interest and for strategic developments, where there is no reasonable alternative of reusing built-up land (art. 5, para. 2). It is not allowed for new housing, except housing needed to start regenerating mainly residential urban areas, or social housing with only the share of open-market homes needed to make it viable. The rules for rural land in art. 36 stay in place (art. 5, para. 3).
  • How much. The total may not exceed 3% of the urbanised area existing when the law came into force on 1 January 2018 (art. 6, para. 1; art. 80). Where no alternative without land take exists, some areas are not counted, such as supra-municipal public works, rural buildings serving farm businesses and urban parks (full list in art. 6, para. 5), or land used to carry out plans in force under art. 4 (art. 6, para. 7).

New development outside the urbanised area must sit next to existing settlements or ones covered by a planning agreement (convenzionati). The PUG’s rules for scattered or discontinuous buildings and their related and infill land still apply (art. 5, para. 4; art. 36, para. 4).

Built-over land by region in 2025, % of the areaHorizontal bars, highest first: Lombardy 12.27%; Veneto 11.87%; Campania 10.65%; Emilia-Romagna 8.95%; Lazio 8.33%; Apulia 8.18%; Friuli Venezia Giulia 8.07%; Liguria 7.31%; Marche 7.02%; Piedmont 6.78%; Sicily 6.62%; Tuscany 6.22%; Umbria 5.29%; Calabria 5.11%; Abruzzo 5.07%; Molise 3.96%; Sardinia 3.41%; Basilicata 3.23%; Trentino-Alto Adige 2.9%; Aosta Valley 2.17%.Built-over land by region in 2025, % of the areaLombardy12.27 %Veneto11.87 %Campania10.65 %Emilia-Romagna8.95 %Lazio8.33 %Apulia8.18 %Friuli Venezia Giulia8.07 %Liguria7.31 %Marche7.02 %Piedmont6.78 %Sicily6.62 %Tuscany6.22 %Umbria5.29 %Calabria5.11 %Abruzzo5.07 %Molise3.96 %Sardinia3.41 %Basilicata3.23 %Trentino-Alto Adige2.9 %Aosta Valley2.17 %012.27 %
Lombardy12.27 %
Veneto11.87 %
Campania10.65 %
Emilia-Romagna8.95 %
Lazio8.33 %
Apulia8.18 %
Friuli Venezia Giulia8.07 %
Liguria7.31 %
Marche7.02 %
Piedmont6.78 %
Sicily6.62 %
Tuscany6.22 %
Umbria5.29 %
Calabria5.11 %
Abruzzo5.07 %
Molise3.96 %
Sardinia3.41 %
Basilicata3.23 %
Trentino-Alto Adige2.9 %
Aosta Valley2.17 %
Share of each region covered by artificial surfaces (buildings, roads, yards and the like) in 2025. Italy as a whole: 7.19%. Fifteen regions are above 5%. These are regional figures: the 3% cap in the Emilia-Romagna law is measured against the urbanised area, not against these percentages.

Source: ISPRA/SNPA, Consumo di suolo, ecosistemi urbani e stato del territorio, 2026 edition, table 18; read on 13 November 2026

Sources: SNPA, land consumption report 2026, table 18; ISPRA, press release of 27 October 2026; accessed 13 November 2026.

Page 64 of the English TerrenoCheck sample report for Bagno a Ripoli: SNPA map of built-over ground in red on the aerial photo, with circles at 250 m and 1 km from the plot and shares of 47%, 26% and 23% within 250 m, 500 m and 1 km
Page 64 of the English TerrenoCheck sample report (page 65 in Italian): for parcel 816 on sheet 23 in Bagno a Ripoli (Florence), the built-over ground around the plot from the national SNPA/ISPRA map, 10 m cells (CC BY 3.0 IT), read on 9 November 2026. AgEA 2022 aerial photo, CC BY 4.0; report sources read from 27 September to 9 November 2026. Open the page in the sample report

The development agreement, stage by stage

Outside the urbanised area, new development under the PUG goes mainly through an accordo operativo, an agreement between the Comune and private parties with the force of a detailed plan (art. 38, paras. 1 and 2). The stages (Emilia-Romagna only):

  1. Proposal, at the Comune. The developer submits an urban design, an agreement with work schedule and guarantees, a financial report and an environmental assessment (Valsat). It is published at once on the Comune’s website.
  2. Review, planning office. Within 60 days of receipt, a binding deadline, the Comune checks it against the PUG and plans in force and weighs the public interest. The limit doubles if the proposal answers a public call by the Comune, in the cases of art. 4, para. 1, or for particularly complex programmes.
  3. Deposit and objections, Comune website and BURERT. Within 10 more days the Comune decides and, if it complies and is agreed, places it on deposit for 60 days from the notice on the Comune’s website and in the regional official bulletin (BURERT), during which anyone can file objections.
  4. Opinion of the Comitato urbanistico (CU, planning committee). Outside the urbanised area it also goes to the CU and the environmental bodies, unless exempt under art. 19, para. 6. The CU gives its opinion within 30 days of receipt; silence counts as a positive assessment.
  5. Vote, municipal council. Within 30 days of the end of objections or of the CU’s time limit, the council rules on the objections, follows the CU’s opinion or gives detailed reasons, and authorises signature.
  6. Signature, at the Comune. Both parties sign within the next 10 days.
  7. Taking effect, BURERT. It takes effect from its notice in the BURERT, provided its full text is on the Comune’s website the same day.

These are per-stage limits, not a guaranteed total. Once in effect, a building permit is still needed unless the Comune finds the agreement itself serves as one for all or part of the works (art. 38, para. 15).

For a new PUG or an amendment, the draft is on deposit for 60 days for objections, extendable by 60 days at most (art. 45, paras. 3 and 5). The municipal executive (giunta) then has 60 days to examine the objections (art. 45, para. 9); then the council adopts the plan, the CU has 120 days for its opinion, suspended if it asks for more documents, and the council approves it within 60 more days (art. 46, paras. 1–6). These limits are halved for the general amendment that moves a municipality with a PSC (structural plan under Regional Law 20/2000) to the PUG (art. 3, para. 2). The plan comes into force on publication of the approval notice in the BURERT, provided the full plan is on the Comune’s website the same day (art. 46, para. 10).

From adoption by the council the salvaguardia (safeguard rule) applies: decisions conflicting with the adopted plan are put on hold. The Comune can bring it forward to the assunzione, the formal acceptance of the draft plan by the competent body before its adozione (adoption), but only if the council itself accepts it. Unless another law says otherwise, it lasts until the plan comes into force, for at most three years from adoption or assunzione, or five if the plan is sent to the CU within one year (art. 27). National rules: what you can build under the PRG.

Emilia-Romagna: the stages of a development agreement (accordo operativo)A vertical process timeline with 7 ordered steps.Emilia-Romagna: the stages of a development agreement (accordo operativo)1Proposal, at the ComunePublished at once on the Comune’s website; preparationtime depends on the project2Review, planning office60 days from receipt; twice that in the cases of art. 38,para. 73Deposit and objections, Comune website andBURERTDecision within 10 days, then 60 days on deposit forobjections4Planning committee (CU) opinionOutside the urbanised area, unless exempt: 30 days,silence counts as positive5Vote, municipal councilWithin 30 days of the end of objections or of the CU’stime limit6Signature, at the ComuneWithin the next 10 days7Taking effect, BURERTFrom publication of the notice, if the full text is on theComune’s website on the same date

Emilia-Romagna: the stages of a development agreement (accordo operativo)

  1. Proposal, at the ComunePublished at once on the Comune’s website; preparation time depends on the project
  2. Review, planning office60 days from receipt; twice that in the cases of art. 38, para. 7
  3. Deposit and objections, Comune website and BURERTDecision within 10 days, then 60 days on deposit for objections
  4. Planning committee (CU) opinionOutside the urbanised area, unless exempt: 30 days, silence counts as positive
  5. Vote, municipal councilWithin 30 days of the end of objections or of the CU’s time limit
  6. Signature, at the ComuneWithin the next 10 days
  7. Taking effect, BURERTFrom publication of the notice, if the full text is on the Comune’s website on the same date
Time limits for each stage, not a guaranteed overall timetable. The chart covers only development agreements in Emilia-Romagna; a PUG or plan change follows arts. 45 and 46, with the safeguard rule of art. 27.

Source: Emilia-Romagna Regional Law 24/2017, art. 38, text in force; read on 13 November 2026

Sources: Emilia-Romagna Regional Law 24/2017 (text in force); accessed 13 November 2026.

What it costs: IMU, charges and purchase taxes

Costs when agricultural land becomes building land
ItemWhen it appliesHow muchConditions and where to ask
IMU at the building-land rateWhen the land becomes buildable under the planning documents; for the general plan, adoption is enoughMarket value × rate set by the Comune (standard 0.86%)Not for land owned and farmed by a coltivatore diretto or IAP enrolled in farmers' social security who keeps farming it. The Comune confirms the status
Special levy (contributo straordinario)With a project in variante or in derogaAt least 50% of the increase in value worked out by the ComuneUnless regional rules or the municipal plan say otherwise. Emilia-Romagna: outside the urbanised area and on unserviced permeable land inside it
Infrastructure charges (oneri di urbanizzazione)When the building permit is issued; instalments on requestTables set by the municipal councilUnless art. 17 or regional rules reduce or waive them. Worked out by the SUE
Construction-cost charge (quota sul costo di costruzione)During the works, no later than 60 days after completionShare of construction cost set by the region by type, use and locationA charge paid to the Comune, not the builder’s price. Not due or reduced in the cases of art. 17
Registration tax on purchaseWhen the deed (rogito) is signed15% as agricultural land, 9% as building land; minimum 1,000 euro, plus 50 + 50 euroDeed signed in 2026, private seller outside VAT, buyer not a registered coltivatore diretto or IAP, no tax relief claimed

Source: Law 160/2019, art. 1, paras. 741, 746 and 754; DPR 380/2001, arts. 16 and 17; Emilia-Romagna Regional Law 24/2017, art. 8; DPR 131/1986, tariff, art. 1; Legislative Decree 23/2011, art. 10; texts read on 13 November 2026

IMU. Land counts as building land if it can be built on under the general or detailed planning documents (Law 160/2019, art. 1, para. 741), and the adopted general plan is enough, even before approval (Decree-Law 223/2006, art. 36, para. 2; from 1 January 2027 art. 336 of Legislative Decree 141/2026). The taxable value is the market value on 1 January, or from the date of adoption (para. 746). Excluded is land owned and farmed by a coltivatore diretto or IAP enrolled in farmers' social security, as long as farming or livestock rearing continues. In Emilia-Romagna the PUG gives open land no right to build, apart from direct urban reuse and regeneration works (art. 25), so ask the Comune to confirm the status (para. 741). See IMU on building land.

Special levy. For projects in variante (a plan change) or in deroga (an exception to the plan), the Comune works out the increase in value, and at least 50% goes to the Comune (DPR 380/2001, art. 16, para. 4, letter d-ter), unless regional laws or municipal plans provide otherwise (para. 4-bis). In Emilia-Romagna it applies to projects outside the urbanised area and on unserviced permeable land inside it (Regional Law 24/2017, art. 8).

Purchase taxes. Registration tax follows the same adopted-plan rule (Decree-Law 223/2006, art. 36, para. 2). For a deed signed in 2026, a private seller outside VAT, a buyer who is not a coltivatore diretto or IAP enrolled in farmers' social security and no tax relief claimed, it is 15% if the land is still agricultural and 9% if the adopted plan makes it building land; never less than 1,000 euro, plus mortgage and cadastral taxes of 50 euro each (DPR 131/1986, tariff, art. 1; Legislative Decree 23/2011, art. 10). On a hypothetical price of 50,000 euro, accepted as the taxable value, that comes to 7,600 euro as agricultural land and 4,600 euro as building land. For registered farmers and deeds from 2027, see the tax guides for agricultural land and for building land.

Buying agricultural land in the hope of rezoning

Before signing a preliminary contract, make three checks with the Comune’s planning office.

  1. Current zoning. Ask for the zoning certificate (certificato di destinazione urbanistica, CDU) showing the plan in force and any adopted changes: the Comune must issue it within 30 days of the request (DPR 380/2001, art. 30, para. 3).
  2. Procedures under way. Ask whether a PUG, plan change or development proposal affecting the parcel is on deposit, and the date of its notice in the BURERT.
  3. Regional limits. Ask whether the land is inside the urbanised area and how much land-take allowance the Comune has left.

If the price assumes the rezoning, the preliminary contract can make the deed conditional on the rezoning act taking effect, through a condition precedent drafted by the notary.

The reverse route: from building land back to agricultural

The Comune can also take building status away through a plan change, sometimes at the owner’s request. Effects and IMU refunds are covered in the guide on building land rezoned as agricultural.

Agricultural land to building land in Italy: who decides

https://terrenocheck.it/en/guide/agricultural-land-to-building-land-italy

Checklist

Before paying for farmland that "may become buildable"

This guide is general information, not legal, notarial, cadastral, technical or tax advice. The TerrenoCheck report screens public sources: it does not verify ownership, title, encumbrances or the right to build. Have the specific case checked by an Italian professional.

Common questions

Can I ask the Comune to make my agricultural land buildable?

You can file objections when the Comune puts a plan, a plan change or a proposed agreement on public deposit, and, where the regional law allows it, put forward a project. In Emilia-Romagna private parties submit proposals for an accordo operativo (development agreement); the Comune checks them against the general plan (PUG) and weighs the public interest. The decision stays with the Comune, and apart from direct urban reuse and regeneration works the PUG gives open land no building rights or legally protected expectations.

How long does it take for agricultural land to become building land?

It depends on the procedure the Comune follows and on the law of the region. For a development agreement in Emilia-Romagna the law sets a time limit for each stage: 60 days to examine the proposal (twice that in the cases listed), 10 days to decide on the deposit, 60 days of deposit, 30 days for the planning committee’s opinion where needed, 30 days for the council vote and 10 days for signing. They do not add up to a guaranteed total: preparing the proposal and the environmental assessment depends on the project.

When does IMU start to be charged at the building-land rate?

From the moment the land can be built on under the general or detailed planning documents; for the general plan, adoption by the Comune is enough (Law 160/2019, art. 1, para. 741, with art. 36, para. 2 of Decree-Law 223/2006). The value counts from 1 January or from the date of adoption. Land owned and farmed by a coltivatore diretto or IAP (registered farmer) enrolled in farmers' social security, who keeps farming it, is not treated as building land. The Comune confirms the status on request.

What do you pay the Comune when land becomes buildable?

With the building permit you pay infrastructure charges (oneri di urbanizzazione) and a share of the construction cost, unless the reductions and waivers of art. 17 of DPR 380/2001 or regional rules apply. For a project in variante or in deroga there is also the special levy: at least 50% of the increase in value worked out by the Comune, unless regional rules or the municipal plan say otherwise. The figures for your project come from the Comune’s building desk (sportello unico per l’edilizia, SUE).

Is it wise to buy agricultural land hoping it will be rezoned?

Before paying, ask the planning office for the zoning certificate (CDU) showing both the plan in force and any adopted changes, and whether any plans, plan changes or development proposals are on deposit. A seller’s promise does not change the plan. If the price depends on the rezoning, ask the notary about a condition precedent in the preliminary contract.

Your plot, read before you negotiate the price

Pick the parcel on the map: published zoning, constraints, hazards and the built-over ground around it are read for that plot, each with a source and date, so you can prepare your questions for the planning office before the preliminary contract.

€29 in English or Italian · €39 in both languages · total, VAT included